  • Mathematics
contestada

A fiber optic cable company is installing cable along a road 6 1/2 miles long. The crew takes a day to install each 1/4 mile of cable. How many days will the installation take?

A fiber optic cable company is installing cable along a road 6 12 miles long The crew takes a day to install each 14 mile of cable How many days will the instal class=

Respuesta :

Otras preguntas

Two hoses are filling a pool the first hose fills at a rate of x gallons per minute the second hose fills at a rate of 15 gallons per minute less than the first
Find −a2 − 3b3 + c2 + 2b3 − c2 if a = 3, b = 2, and c = −3.
How do I factor e^2-10e+25
The statements in the box summarize religious beliefs that helped promote attitudes that would prepare the modern world for democracy. in which movement did the
A vending machine has 5 colors (white, red, green, blue, and yellow) of gumballs and an equal chance of dispensing each. A second machine has 4 different animal
Question 6 of 10 In 1917, communist revolutionaries overthrew the Russian government and established the Soviet Union. While they fought on the same side during
What set of numbers shows all the factors of 18
write 7*7*7 in standard form
what reservoir/sphere is nitrogen stored long term?
If f(x)=\sqrt(3x+2) , what is the equation for f-1(x)