London3416 London3416
  • 24-01-2024
  • Engineering
contestada

An SFA designation before a filler metal specification (such as SFA-5.4) means:
a) Submerged Arc Welding
b) Shielded Metal Arc Welding
c) Specification for Filler Alloy
d) Stainless Filler Approval

Respuesta :

Otras preguntas

A class of sixty voted for class president. 30% voted for brad and 70% voted for Jane. How may votes did the winner get?
The position to put a patient in for a pelvic examine
what is the definition of decentralized nerve net?​
Are these(4,1) 1,-3) (2,0) solutions to this graph?
What is the best estimate for the height of a tree ?
Ying-Ying feels her daughter’s home
Which statement about quotation marks is true? 1. Quotation marks set apart short quotations II. Typically, a direct quotation requires three quotation marks II
Which of the following statements is not true of most large optical telescopes
I need help please and thank you
MATHS QUESTION HELP RN ANYONE