M can do a piece of work in 20 days. He works at it alone for 5 days and N alone finishes the remaining work in 9 days. In how many days, both of them together can complete the work ?
1. 12.5 days
2. 8 days
3. 10 days
4. 7.5 days

Respuesta :

Otras preguntas

Suppose you compete in a Cournot oligopoly market consisting of six firms. The equilibrium market price and quantity are $5 and 10 units, respectively. The marg
Angle ABC is isosceles AB=3x-4 and BC=5x-10 Ab=
Did world war 1 or world war 2 have a larger impact on Kentucky?
Why doesn't she love me? A)She talking to someone else B)Cuz I’m a nice guy C)Cuz I love too much D)All of the above
[tex] {x}^{2} + 16x + 10 = 0[/tex]Split the middle term.​
Is it possible to know the origin of the world?
A number is divided by 6, and then the quotient is added to 29. The result is 41.
what is the value of -35•(5/7)?
TRUE OR FALSE: The Japanese achieved their objective of crippling the US Navy and keeping the US from helping other countries in Southeast Asia.
If measure FG = 120° and measure EH = 94, what is measure angle EPH? A) 94 B) 120° C) 114 D) 107°