kadabug6620 kadabug6620
  • 25-02-2024
  • Business
contestada

With regard to generally accepted construction management practices, a contract is finalized when:

A) The terms are agreed upon
B) Signatures are obtained
C) Payment is made
D) Both A and B

Respuesta :

Otras preguntas

What's wrong with it
Name a capital letter that appears to have parallel lines
round 7.53 to the nearest whole number
Hurryyyyy! Need the answer quick!!!!!Describe how a valley glacier forms.
What is measure of angle R? Enter your answer as a decimal in the box. Round only your final answer to the nearest hundredth.
Does After-School Work Affect School Performance?
What is not a form of renewable energy
If the radius of a circle is 10 feet, how long is the arc subtended by an angle measuring 81°?
You have 1/2 of a pizza left and you want to share it equally between 2 people.How much of the pizza does each person get?
what is the average salinity of ocean water