kareli3145 kareli3145
  • 22-03-2024
  • Business
contestada

______ is the arrangement of resources to produce goods and services effectively and efficiently.
a) Industrial design
b) Facility layout
c) Asset allocation
d) Process engineering

Respuesta :

Otras preguntas

What is the basic building block of all things
How much times does 7 go into 17?
5x^2+19x+12 factor the polynomial
The employees from maintenance go for coffee together every day at 9 AM. On Monday, Hector paid $5.45 for three cartons of milk, four cups of coffee and seven
What is the average of something (mean or mode) I really need to know I forgot what the difference was ho
If the The length of a rectangle is 5cm longer than twice the length of the width and the area if the rectangle is 403 square centimeters,what is the width?
how does muscle fatigue help maintain homeostasis?
how do I solve this problem? mars rotates on its axis at the rate of . 2552 rad/hr how many hours are in a martian day?
What happened to the number of moles in a sample that originally occupied 500mL with 2.50 moles and then occupied 750mL? It deals with gas laws
Why am I so annoying? How can I change myself?