ariannagonzalez11 ariannagonzalez11
  • 22-06-2018
  • Mathematics
contestada

a construction company can remove 2/3 tons of dirt from construction site each hour how long will it take them to remove 30 tons of dirt from the site?

Respuesta :

Goldenpineapple123
Goldenpineapple123 Goldenpineapple123
  • 22-06-2018
You would want to divide 30 by 2/3 so you would do 30/1 times 3/2. This method is known as keep change flip or kcf (Kentucky Chicken Fried is what some people say) your final answer should come out to 90/2 which simplified is 45. Hope this helped
Answer Link

Otras preguntas

A hallway measuring 90 feet x 7 feet requires 1/2 a fluid ounce of cleaning solution per square foot. How much cleaning solution is required to clean the hallwa
A railway train 50 m long passes over a bridge 250 m long at the rate of 12 km/h.How long will it take completely pass over the bridge?
define orogenesis and locate major orgenic belts on the earth today
paul paints a room in 6 hours. joel paints the room in 3 hours. how long will it take them to paint togather?
if I have the height and volume of a cylinder, how do I find the radius? or diameter?
If a 25 ft rope is cut into two sections with one section 4 times as long as the other section, how long is the shorter piece?
In 1803, who was sent to Paris to buy New Orleans?
16 raised to the second power + X raised to the second power = 30 raised to the second power. QUESTION: What does X equal?
let f(x)=3x-6 and g(x)=x-2. find the g/f and state its domain.
5^3x=27, what is the value of 5^2x?