maddireigh573 maddireigh573
  • 23-04-2019
  • Business
contestada

Aggregate planning is capacity planning that typically covers a time horizon of one to three months. True or false?

Respuesta :

MsTeel
MsTeel MsTeel
  • 24-04-2019

Answer:

False

Explanation:

Aggregate planning is typically done 6-18 months prior to the time period it covers.

Answer Link

Otras preguntas

After the blitzkrieg in Poland in 1939, France and Britain __________. A. declared war on Germany B. forced the Germans out of Poland C. advised Poland to respe
A square rug covers 79 square feet of floor. What is the approximate length of one side of the rug?
140/96 into a mixed number
What is the solution to the following system of equations? y = −x2 − 5x − 4 y = −x2 + 9x − 18 a. (-1, -10) b. (1, -10) c. (-1, 10) d. (1, 10)
During World War II, Germany tried to capture the Russian city of Stalingrad because a. it was the site of atrocities committed by Stalin. b, it produced armam
how to solve scientific notation word problems?
As a result of the Treaty of Paris of 1763, A) France lost all of its possessions in North America. B) most of Spain's New World empire was transferred to Fran
what is 2.471 rounded to two decimal places?
What chemical processes do producers and consumers share and do not share
why do historians divide the past into eras?