prabhatimsina prabhatimsina
  • 21-11-2019
  • Mathematics
contestada

If it takes a person to dig a garden in 6 days and another person 2 days how many days would it take for them to finish together

Respuesta :

5156323
5156323 5156323
  • 21-11-2019

Answer:

4 Days

Step-by-step explanation:

Because, The 6 day person would slow down the 2 day person to 4 days :)

Answer Link

Otras preguntas

For a batter to increase momentum at the plate, he/she can? Choose a lighter bat Choose a heavier bat Choose an aluminum bat Choose a wooden bat
What role does the infinitive phrase play in this sentence?julius caesar's most lasting reform was to set up a new calendar?
What did winston churchill mean by this? "But if we fail, then the whole world, including the United States, including all that we have known and cared for, wil
What is the comparative form of the adjective early?
John F. Kennedy, the Democratic nominee for President in 1960, was a senator from a.New York b.California c.Texas d.Massachusetts
What is the difference between an approximate and an exact number?
Minerva buys used bicycles, repairs them, and sells them for a profit. She bought a bicycle for $10, repaired it, and sold it for $50. What was the percent incr
____ improves as degree of educational attainment increases. A)Interest rate B)median income C)savings ability D)borrowing rate
Will be MARKED AS BRAINLIEST :)Brenda walks dogs after school. She is planning to increase the rate that she charges by 20% in January. Brenda's current rate fo
show that 9a + 3b has a greater value than 3x + 4y (photo provided)