brooklynskyles918 brooklynskyles918
  • 25-11-2019
  • Computers and Technology
contestada

Select the correct answer.
In which phase does the development team check the project for error handling capabilities?

A , design
B, testing and delivery
C, development
D, maintenance

Respuesta :

Аноним Аноним
  • 25-11-2019

Answer:

B

Explanation:

engineers design and carry out test cases and evaluate exit criteria (by following the scope set in the planning phase). They create bug reports describing detected defects and report to the stakeholders on the test findings and the completion status. Testing may be repeated to check for errors.

Answer Link

Otras preguntas

i feel a kinda sharp out of breth feeling everytime i breath hard i even just running up my staircase(or walking) im outta breath. If I breath hard sometimes so
Question 31: Please help what is the cosine ratio of ∠X in the given triangle?
The triangle has size with the lengths of 3 cm 13 cm and 14 cm Is it a right triangle?
A train started from rest and moved with constant acceleration. At one time it was traveling 27 m/s, and 150 m farther on it was traveling 54 m/s. Calculate (a)
Cindy has a poster in the shape of a parallelogram. What is the area of this parallelogram? 2.85 ft² 3.60 ft² 4.35 ft² 15.21 ft² Parallelogram A B C D
please help need done !!
Suppose in a certain triangle, the degree measures of the interior angles are in the ratio 2:3:4 If the largest angle measures x^,what is the value of x
Is 1,1,2 a Pythagorean triple
solve for x: 4(x+2) = 3(x-2) a. -2 b. -4 c. -10 d. -14
Which statements about the box plot are correct? Check all that apply. Fifty percent of the data values lies between 34 and 46. Seventy-five percent of the data