chitrasairam chitrasairam
  • 24-01-2020
  • Mathematics
contestada

If 5 persons can do 5 jobs in5 jobs in 5 days, then 50 persons can do 50 jobs in _______

Respuesta :

sabienadderley03
sabienadderley03 sabienadderley03
  • 24-01-2020

Answer:

50 days

Step-by-step explanation:

the values are proportional.

Answer Link

Otras preguntas

Please help me with this
What expression is equivalent to n^2+26n+88 for all values of n. A. (n+8)(n+11) B. (n+4)(n+22) C. (n+4)(n+24) D. (n+8)(n+18)
A helicopter flies 168 miles against the wind in 2 hours; with the wind, it can fly 252 miles in the same amount of time. find the speed of the helicopter in st
What is the best answer here? help ASAP
Sally needs 2/3 of a pound of potatoes. This is 1/3 of a pound more than 4/3 of the potatoes Sally has in her pantry
_________________. water route that explorers hoped would flow through North America, connecting the Atlantic and Pacific oceans
In a posteroanterior (pa) projection of the chest being used for cardiac evaluation, the heart measures 14.7 cm between its widest points. if the magnification
Calculate the force of earth's gravity on a 1kg mass at earth's surface. the mass of the earth is 6.0
4 divided by 3/4 reduce to lowest terms
A lacrosse team raised some money. They used 74% of the money to buy uniforms, 18%for equipment, and the remaining $216 for a team party. How much money did the