30 men can do a piece of work in 40 days .how long it take to complete the work if 5 men were reduced​

Respuesta :

Аноним Аноним
  • 23-02-2020
30 men -> 40 days
1 man -> 1/1/3 days
30-5men = 25 men
25 men -> 1/1/3 x 25
= 33/1/3 days
Answer Link
tolaosunrinde
tolaosunrinde tolaosunrinde
  • 23-02-2020

Answer: 48 days

Step-by-step explanation:

If it takes 30men 40days to complete a task, 1 man takes 30×40= 1200 days

25 men will therefore take 1200/25= 48 days.

Answer Link

Otras preguntas

why did Josiah Strong supported American imperialism
rewrite the equation in standard form 7-y=5x+11​
when latasha finished the next level of her video game she lost 70 points for each 5 targets she missed
the deserts which bound velds.starts with the letter K​
What will happen after fossil fuel reserves peak if demand remains the same? Reserves will become depleted. New reserves will be continuously discovered. New su
cuanto es dcneicneen eie neim ​
The toy store had a 60% off sale. If a toy had a sale price of $2.00, what was the original price? $5.00 $3.33 $2.60 $4.00
Mary has 36 flower pots. She plants daisies in 2/3 of her flower pots. In how many flower pots does Mary plant daisies?
High Country Builders currently pays an annual dividend of $1.35 and plans on increasing that amount by 2.5 percent each year. Valley High Builders currently pa
Pls help this is a exam thousand injuries of Fortunato I had borne as I best could; but when he ventured upon insult, I vowed revenge. You, who so well know the