hwiles0104 hwiles0104
  • 23-09-2020
  • Mathematics
contestada

A repair company charges $60 per hour of work.the repair company works 7 hours on a job.what is the total charge.

Respuesta :

jrspamstuff24
jrspamstuff24 jrspamstuff24
  • 23-09-2020

Answer: $420

Step-by-step explanation:

60 dollars x 7 hours = 420$

Answer Link

Otras preguntas

What is the justification for each step in solving the inequality? 2x+23≤3x−56 Select from the drop-down menus to correctly justify each step. 2x+23≤3x−56
A bobsled is pushed with a force of 190.08 N. The sled has a mass of 28 kg. What is the acceleration of the bobsled? Report to the nearest tenths place and roun
What might a discordant coast look like?
Sweet T purchased a new pair of jeans to wear to the battle of the brands on sale at 40% off. He save $20. What was the regular price of the jeans?
Which group has the highest suicide rate? select one: a. african american men 85 years and older b. anglo/white men 85 years and older c. african american women
If you move a Substance from one container to another and it shapes changes but it’s volume does not change the substance is a
English Help? What should you check for in an essay revision? What should you check for in the editing process?
What is the equation in point−slope form of the line passing through (2, 2) and (4, 8)? can someone help me a little
Help i was sick and missed this lesson
1. 7 c 3 fl oz – 3 c 4 fl oz PLS ANSWER