D6otty1mejimtaije
D6otty1mejimtaije D6otty1mejimtaije
  • 21-09-2016
  • Physics
contestada

Calculate how much work you need to move a 280 N shed to a platform 5 m above.
A 2,800 J
B. 1,400 J*
C. 56 J

Respuesta :

taskmasters
taskmasters taskmasters
  • 23-09-2016
Work is done when a motion resulted from the force being done by an object. The amount of work done is calculated by multiplying the force applied and the distance traveled. It is calculated as follows:

Work = Force x distance = 280 N x 5 m  =  1400 J.
Answer Link

Otras preguntas

What is an example of commodity money? a. coins b. precious stones c.a tractor d.currency
can spoon ring like a bell prove it
El vuelo _______ a las cuatro de la tar(de). saldré saliré salirá saldráget rid of the () because it will ever let me post it the way it is
Which two terms describe a condition in which there is widespread scaling of the skin?
Primates that walk on two feet are now called
Which lifestyle change can benefit a person with diabetes?
How were african-americans (who were free treated in northern cities?
1) A number that can be written as a fraction of two integers is called a _ _ _ _ _ _ _ _ _ _ _ _ _ _ number. It has a decimal representation that terminates or
which one of the following is a vestigial structure ( A ) Right leg ( B ) liver ( C ) heart ( D ) appendixPLEASE HELP MY YOU GUYS !!!!!!!!!!!
lable the parts of the heart