harry2206 harry2206
  • 21-10-2020
  • Computers and Technology
contestada

Which of the following stakeholders makes policies for a green economy?

Respuesta :

sankalp80
sankalp80 sankalp80
  • 21-10-2020

Answer:

government is the answer

Answer Link

Otras preguntas

_____ is the belief that people should be as free as possible from government restraints. a. Nationalism b. Monoculturalism c. Industrial capitalism  d. Liberal
Identify two powers the US Constitution prohibits the states from having.
turn 1/8 in to a decimal
Determine whether the system of linear equations has one and only one solution, infinitely many solutions, or no solution. Find all solutions whenever they exi
write the equation a. a line with slope 2/3 that passes through the point (-3,6)b. a line that passes through the points (3,-1)and (5,7)
The combination of units written kg·m/s2 can be used for which of the following? A. acceleration B. mass C. force D. weight
5 FRIENDS GO OUT TO LUNCH AND ORDER 5 PIZZAS, THE FRIENDS DIVIDED THE PIZZAS EVENLY.FIND HOW MUCH PIZZA EACH FRIEND GOT AS A DECIMAL
"He wrote the diary in a secret shorthand."Where is the simple predicate in the sentence above?
How do you solve sleep deprivation? And i am not trolling!
Two fifths the cube of a number