What does the measurement tell you?

Schedule performance index

Respuesta :

Аноним Аноним
  • 21-10-2020

Answer:

how close the project is to being completed compared to the schedule/ how far ahead or behind schedule the project is, relative to the overall project

Explanation:

Answer Link

Otras preguntas

What is the blood vessel that comes from the heart and goes to the liver, stomach and intestines, kidneys and lower body and legs ​
A meteorologist was accurate 90% of the time, reporting accurately for 45 days. How many days of weather did he report
Numbers that are both larger than –2 and smaller than 3.
Please help me with this !..
Pre-Calc help: Write the general equation for the circle that passes through the points (1, 1), (1, 3), and (9, 2). You must include the appropriate sign (+ or
3. A breeder wants to mate a male Himalayan rabbit with a female to produce only Himalayan offspring. What phenotype should the female be?
The great Gatsby by F Scott Fitzgerald How did daisy approach wealth?
In a recent year a baseball team paid six times as much to their ace pitcher as they paid to their shortstop. If they paid $56 million for the two salaries, wha
Movie tickets cost $5.00 for children and $8.00 for adults. On Thursday, the movie thester sold 110 tickets and collected $820. How many childrens tickets were
All of the following are characteristics of the culture of North Africa except __________. A. more than 90% of people practice Islam B. all people speak Berber