jeancalixteosmi3726 jeancalixteosmi3726
  • 21-12-2020
  • Business
contestada

Which type of control chart should be used when it is possible to have more than one mistake per​ item?
A. c​-chart
B. p​-chart
C. x​-bar chart
D. R​-chart

Respuesta :

hyderali230
hyderali230 hyderali230
  • 23-12-2020

Answer:

A. c​-chart

Explanation:

C chart is a control chart that is used to count the data like numbers of nonconformities per unit. It is used to monitor the total occurrence per unit.

In this chart, the data is collected in the sub-groups and then the data is analyze to check the defects or mistakes or nonconformities.

If there is more than one mistake per item the C- chart is the best match.

Answer Link

Otras preguntas

what is somethingabout hitler
GIS is a type of software that is a new technology in geography. GIS stands for __________.
New Mexico has an area of 121,298 square miles. California has an area of 155,779 square miles. How much greater is the area, in square miles, of California tha
I have 8 thousands, 7 ones, 5 tens, 2 hundreds, 7 tenths and 3 hundredths. What number am i?
to make 5 apple pies you need about 2 pounds of apples how many pounds of apples do you need to make 20 apple pies
P is the midpoint of DE¯¯¯¯¯ , DP=3x+2, and PE=5x−6. What is the length of DE¯¯¯¯¯ ?
According to theories, what was Earth’s atmosphere originally like?
Why is physical process such as air circulation and precipitation affect humans?
which statement best describes the status of Egyptian women
How does a digit in the 10,000s place compared to a digit in the thousands place