yntuaigg5p yntuaigg5p
  • 24-12-2020
  • Mathematics
contestada

An artist has completed 1/4 of paintings in 2 weeks. At what rate is she working?

Respuesta :

facundo3141592
facundo3141592 facundo3141592
  • 29-12-2020

Answer: the rate is (1/8) paintings per week

Step-by-step explanation:

We usually define the rate as the amount of work done in some unit of time.

In this case, we know that the artist does 1/4 of a painting in 2 weeks, then the rate can be written as:

(1/4)/2  paintings/week = (1/8) paintings/week.

This means that the rate is (1/8) paintings per week, this is the weekly rate at which she works.

Answer Link

Otras preguntas

Line AB and Line BC are tangent to P. What is the value of x? 73 107 117 146
write in scientific notation. 0.5(8 X 10^5)
Which one of the following parenting factors is associated with improved IQ scores in children? A. Strict discipline B. A stable home and varied act
cos x=0.000 nearest degree
A team of conservation scientists worked on the project shown in the image. Why is this project necessary at this location? a.Soil erosion rates are high. b.Dro
Evaluate the expression by using the given values of the variables.   y ÷ 3 • 2 – 8 ÷ x + 5 where x = 4 and y = 12   A. 5   B. 11   C. 21   D.
I don't know how to do this
Find the expectation of times of rolls if u want to get all 6 numbers when u can rolling a 6 sided die.
The term appeasement is best defined as
Mira analyzed oxygen and carbon dioxide in inhaled and exhaled air. She found that the percentages of both gases were different in each. What other gas would m