How should work be allocated to the team in a Scrum project?

Respuesta :

kennethvaughn6
kennethvaughn6 kennethvaughn6
  • 24-05-2021

Answer:

In a Scrum project, the work or the tasks are not allotted specifically. The Scrum Master is not allowed to assign tasks to the team members under any circumstance. Once the client provides the details regarding their requirements in detail, the tasks are distributed based on the expertise and skills of the employee.

Explanation:

Answer Link

Otras preguntas

Who controlled the land west of Mississippi River during the American Revolution?
What is one organelle that all prokaryotic and eukaryotic cells have? A: ribosomes B: cell wall C: vacuole D:nucleus
What is a short but good definition of the scientific method?
y=-2x+11 what is the slope and y intercept?
round 12.03994 to 3 decimal place
An element's reactivity and other chemical properties are determined by the number of
Which statement about the artist Michelangelo is not correct? A. He admired the classical past of Greece and Rome and the humanist ideals of the Renaissance. B.
Why are nutrients from fertilizer harmful to aquatic ecosystems?
what is 5/12 - 3 /8 in simplest form
A 2-kg book is pushed along a table with a force of 4N. Find the frictional force on the book if the book's acceleration is 1.5 m/s squared. Explain how to find