aishaaly aishaaly
  • 25-05-2021
  • Mathematics
contestada

If 6 workers can build 4 cars in 2 days, then how many days would it take 8 workers to build 6 cars?

Respuesta :

sharagracemontero sharagracemontero
  • 25-05-2021

Answer:

9/4 days

Step-by-step explanation:

Hope it helps!

Answer Link

Otras preguntas

Use mercantilism in a sentence
how many point of parallel sides does the trapezoid have
What is the velocity of a wave with a frequency of 6 Hz and a wavelength of 2 m?
How was the Atlantic slave trade different in the 1400s and 1500s than it was in the 1600s? A. In the 1400s and 1500s, more slaves were sold to Asian count
Which expression does NOT equal 4/5? 4 x 1/5 2 + 2/5 1/5 + 1/5 + 1/5 + 1/5 2 x 2/5
according to the ninth amendment, who retains certain rights not mentioned in the constitution?
tomas bought a bottle of shampoo that held 10.5 fluid ounces. he uses 1/16 of the shampoo every time he washes his hair. how many ounces of the shampoo are left
A painter painted about half a room in half a day. Coley estimated the painter would pain 7 rooms in 7 days. Is Coley's estimate reasonable? Explain
You are going to mix a gallon bucket of window cleaner. The instructions direct you to mix 1 part cleaner to 3 parts water. How much cleaning solution will you
290 is 10 times as much is 2900