PARKING LOT PANELBOARD FEEDER DEMAND LOADING:
A parking lot panelboard is supplying 62 parking stalls on 15 amp circuits which are
restricted or controlled. Determine the total calculated demand load in kW for the
FEEDER conductors supplying the panelboard.
The calculated demand load is ____ kW

Respuesta :

angelluisyarn
angelluisyarn angelluisyarn
  • 21-10-2021

Answer:

77kw

Explanation:

just add them

Answer Link

Otras preguntas

What did FDR think was the governments role in response to the problems
How did Gamal Abdul Nasser gain power in Egypt in 1952? Question 2 options: A) He was elected by popular vote B) He was appointed by the King C) He staged a blo
Who is the winner in IDOL-England?
how are rainbow crow and petra different?use details from both stories to support your answer.
What if there was a square window on the wall with a side length of 2 feet? how much wallpaper would lila need then?
Find the measure of each angle indicated
Why Do You Think This Story "The Scent Of Memory"?
Many human traits, such as blood type, are a result of more than two types of alleles. This inheritance pattern is called A) codominant . B) multiple alleles
Express as a sum: 15–7 Please show work
Please help!!!! With this problem