uhguhgjj
uhguhgjj uhguhgjj
  • 25-10-2021
  • Mathematics
contestada

A group of workers can plant at a rate of 16 hectares per day.
How many hectares can they plant in 4 days?

Respuesta :

1450364
1450364 1450364
  • 25-10-2021

Answer:

They can plant 64 acres a day

Step-by-step explanation:

16 x 4 = 64

Answer Link

Otras preguntas

Static stretches are part of an effective cool down because they can help A) improve performance B) decrease blood flow C) prevent overload D) increase range of
The first item in a Works Cited entry is normally the a. author's last name b. year of publication c. name of publication d. title of the book or article
Kahulugan ng pinayuhan
how to solve this linear equation. 12/5f=-18
The bowl-shaped depression at the top of a volcano is a a. crater. b. fissure. c. vent. d. conduit.
3. What is the legacy of the Battle of the Hundred Slain/Fetterman Massacre?
A cartel differs from a monopoly in that
slove for x 3x-1/4=-5/11
Is 95.045 greater than 95.545
How can finding out that a hypothesis is not true be useful for a scientist