26mgray
26mgray 26mgray
  • 26-01-2022
  • Mathematics
contestada

The total cost to fix your bike is $45. The parts cost $10, and

the labor cost is $7 per hour. How many hours did it take?
7x+10=45

Respuesta :

sam736
sam736 sam736
  • 26-01-2022

Answer:

5 hours

Step-by-step explanation:

7x+10=45

7x = 35

35 / 7 = 5

x = 5

Answer Link

Otras preguntas

At what point (x,y) do the two lines with equations x-2y=5 and 3x-5y=8 intersect?
What is x2 -6x-23=0 using square roots
A test tube containing CaCO₃ is heated until the entire compound decomposes. If the test tube plus calcium carbonate originally weighed 30.08 grams and the loss
At what point (x,y) do the two lines with equations x-2y=5 and 3x-5y=8 intersect?
What is the x-coordinate of the point in the standard (x,y) coordinate plane at which the 2 lines y = 2x + 6 and y = 3x + 4 intersect? Can you please explain wi
What were the causes of the cold war?
Which is closest to 0.5? 0.4, 0.505, 0.449, 0.48 or 0.53?
Which is closest to 0.5? 0.4, 0.505, 0.449, 0.48 or 0.53?
Electrolysis of a dilute solution of aqueous sodium chloride results in the cathode product a. Sodium b. Hydrogen c. Chlorine d. Oxygen e. peroxide
the area of a sector of the circle with an arc measure of 45 degree and with a radius of 4 is?