upsups561 upsups561
  • 23-05-2022
  • Business
contestada

A comparison between actual and projected expenditures is called.

Respuesta :

martynaloafsuj
martynaloafsuj martynaloafsuj
  • 23-05-2022

Answer:

variance analysis

Explanation:

a comparison between actual and projected expenditures is called variance analysis

Answer Link

Otras preguntas

This is about the Declaration of Independence!
A solution is prepared by dissolving 22.7 g of CaCl2 in 375 g of water. The concentration of CaCl2 is __________% by mass.
Which line best develops the setting of "The Cremation of Sam McGee"? Question 21 options: And that very night, as we lay packed tight in our robes beneath the
0.2 is 1/10 of?What is the answer
Help my cousin pls Credit: 10 points
Who was the senator from Kentucky who tried to extend the Missouri compromise line to the pacific
The time signature 9 8 is equivalent to _______ meter. a. simple duple b. simple triple c. compound duple d. compound triple
Which number is real and rational? A: 5√ B: π C: 3√ _ D: 0.3
Simple subject for penguins are birds that thrive in cold places
23. write an inequality for the graph