diven1830 diven1830
  • 21-09-2017
  • Mathematics
contestada

Suppose that the time it takes to do a job is inversely proportional to the number of workers. that is, the more workers on the job the less time required to complete the job. if it takes 2 workers 8 days to finish a job, how long will it take 8 workers?

Respuesta :

katerabrayton katerabrayton
  • 24-09-2017
i think it would be 2 days. you would get it done 4 times faster, so 8/4 is 2
Answer Link

Otras preguntas

PLZ ANSWER NEED HELP ITS PRACTICALLY FREE POINTSHiggins was asked to make a unique three-letter arrangement using only letters from the word home. He can use ea
writings that contain accounts of the life and teaching of Jesus
Sam has a card that is a quadrilateral.All sides are equal length.One of the angles measures 60 degrees.Which quadrilateral is Sam's card?
Japanese troops killed over 50,000 Chinese civilians in _____.
What is #4 "find the volume and total surface area of the trapezoidal based prism shown At right
What is the solution for x
In Assyria, Sargon was succeeded to the throne by Sennacherib. True False
What is the balance as a result of having a credit of $84 and a debit of $29
how is an epicentral distance determined?
Which behaviors might lead someone to have a low credit score?