Relative to the project's life cycle, when is the cost per risk discovered typically highest

Respuesta :

andriansp andriansp
  • 01-12-2017
Relative to the project's life cycle, the cost per risk discovered is typically highest during the end of closing of a project.
For any project, a lot of risk will only be spotted after the company started its own operation. Because up to this point, the company usually already determine which type of risk is the most likely to happen.
Answer Link

Otras preguntas

Fill in the blank with the correct form of ser. Nosotros _____ fuertes. soy somos eres son
It is (hotter or colder) at the top of the mountain? Why? (explain below)
I need to know which word is spelled correctly
Given the function with f(3)=127 and f(1)=95, determine the rate of change over the interval 1≤x≤3 a.16 b.116 c.132 d.32
According the passage, where is "the most expensive house" located? A. on the surface of Mars B. Hollywood, CA C. circling above Earth D. New York City
Describe a situation where you could properly conclude that a set of data is precise but not accurate.
Which two monarchs headed the Reconquista?
Describe the three kinds of plate boundaries. Explain your answer in at least three to four sentences.
need You help Here Pls​
Which is the best conclusion that can be drawn by comparing the chart and the graph? A. The number of Christians in Central America is greater than in North Ame