jestepp65
jestepp65 jestepp65
  • 22-11-2017
  • Computers and Technology
contestada

You can create an active link between a source program and a destination program using

A. a floppy disk.
B. WYSIWIG.
C. OLE.
D. page layout.

Respuesta :

munch15
munch15 munch15
  • 22-11-2017
The correct answer is C
Answer Link
andriansp andriansp
  • 22-11-2017
The answer is C. OLE
In programming term, OLE stands for Object Linking and Embedding, which allows an editing software/application to add a certain part of document to another editing software/application. This technology was first created by Microsoft for their developers.
Answer Link

Otras preguntas

Starting time is 2:15am the elapsed time 45minutes what is the ending time
What was the Manga Carta? What impact did it have on English political traditions?
List the sequence of events in 1942-1943 gave the Allies control of north africa
what are the three types of seismic waves? which one does the most damage to property?
TRUE or FALSE A sea arch is formed through wave erosion.
what were some key motives for Europeans during the age of exploration
Which two elements have the same number of valence electrons?
Determine the number of moles of mg2+(aq) ions produced when 2.5 moles of zn 2+aq react completely in this cell
When Does The Median Represent A Typical Jump Better Than The Mean Does?
Read this cover letter: Dear Sir or Madam: I am responding to your ad seeking data managers. I feel I am highly qualified for the position and have a great de