austinhale7329 austinhale7329
  • 24-11-2017
  • Business
contestada

An event that must occur in order for a party's duty to arise is called a(n) ________________.

Respuesta :

meerkat18
meerkat18 meerkat18
  • 05-12-2017
This is what they call condition precedent. The party's task to perform arise after a specific event happens. However, when the event never happens, the duty of the party to perform will never arise. The parties are discharged from the contract. 
Answer Link

Otras preguntas

Como llego a la tienda?
write slope-intercept form of the equation of the line described.through(5,4), parallel to y=(1/5)x-5​
5. Robyn enjoys news _______ about health because she's a doctor. She also reads articles about health.
Graph the line with slope 1 passing through the point (5,4) .
Match each ecosystem with its location. (5 points) Column A 1. Alpine : Alpine 2. Tundra : Tundra 3. Grassland : Grassland 4. Deciduous forest : Deciduous fores
What is a work of fiction?
1. Mr. Miller is building a dollhouse for his daughter Juanita. He is designing the dollhouse after a colonial home with a height of 10 yards. If he wants the d
What was the outcome of the Latin American revolution?
solve the system of equations. please help asap! i appreciate it!
Why are people part Mongolian? Explain why in one paragraph please